Some of the many benefits our clients have realized through our services.

  • Interim Plant Manager Service at a Steel fabrication plant yielded the following in 4 months:

   Safety, 25% improvement in DART (Days Away Restricted or Transferred)

         Quality, Scrap and rework costs reduced by 50%

         Delivery, OTD improved by 15%

         Cost, Labor efficiency improved by 35%

         Engagement, absenteeism reduced by 22% with 0 turn-over

  • 50% improved DART rate at a heavy equipment production plant and 60% at a high volume manufacturing plant

  • 3.5% year-on-year raw material and indirect material cost savings at a Global Aerospace manufacturer

  • Operational Profit improvements of 10% to 18% at several steel fabrication plants

  • 4% improved Return On Capital Employed at a storage vessel supplier

  • 50% lead times reduction at a Custom Equipment manufacturer

  • Delivery Performance improvement of 30% at a Fiber Re-enforced Products manufacturer

  • Cost variance reductions of 16% to less than 1% at a Plastic Compounding Facility

  • 22% Production Capacity increase without additional labor or investments at a Super Precision Machine Tool supplier

  • Reduced Cost of Poor Quality by $250k annually on a high volume coatings operation

  • Reduced Indirect Labor Costs by 18% at a Contract Medical Devices Manufacturer

  • Improved Overall Equipment Effectiveness (OEE) by 15% at several high volume extrusion plants

  • Reduced manufacturing costs of Oil and Gas processing equipment by 29%